ETME32203 — (was 3322) Project Management
Add to Bookmarks Three hours lecture. Three credit hours. Was ETME 3322. Study of project planning and scheduling using the network methods as presented by PERT and CPM. Network planning, solution methods, and practical applications. Probabilistic time estimates, resource leveling, cost optimization, and cost control techniques. Includes application of computer solution methods.
Prerequisites: MATH11003